Skip to content
Instant digital downloads · Every file checked before release · Browse free resources

Use the left and right arrow keys to move between preview images.

Editable document · Digital download

Change Order Forms

Editable change order forms in Word and PDF: change request, priced change order with contract sum and signatures, change order log and time-and-materials record — US Letter and A4.

DOCXPDF4 files1.2 MB
Price $19.00USD

Included in Studio membership downloads.

  • Instant digital download — nothing is shipped.
  • Secure checkout by Stripe.
  • Version 1.0.3 · updated Nov 9, 2026.

Description

What's inside. Four forms that document a contract change from request to payment. The change order request records who asked, why (checkbox reasons) and what changes. The change order itself has a cost breakdown table (labour, materials, equipment, subcontract), overhead, profit and tax lines, the original contract sum, previous approved changes and revised contract sum, the time impact and signature blocks for client and contractor. A log tracks every change order and its status, and a time-and-materials record supports changes priced on actual cost. Word and PDF versions have the same pages.

Pages and sheets. How to use these forms; Change order request; Change order (pricing, contract sum and approval); Change order log; Time and materials record.

Files and formats (DOCX, PDF). Change-Order-Forms-Letter.docx (DOCX, US Letter, 6 pages, 552 KB); Change-Order-Forms-A4.docx (DOCX, A4, 6 pages, 552 KB); Change-Order-Forms-Letter.pdf (PDF, US Letter, 6 pages, 70 KB); Change-Order-Forms-A4.pdf (PDF, A4, 6 pages, 71 KB). Word page counts are as laid out in LibreOffice; Word or Google Docs may differ by a page. Every download also includes a ZIP of all files and a licence summary.

Editing. The Word (.docx) files use real headings, tables and fill-in fields (content controls and checkboxes), and the Inter font is embedded in each file. Apps that don't support embedded fonts substitute a similar font.

Licence. Standard Licence — use it for yourself, your household or your own business and print unlimited copies for that use; completed documents can go to your own clients. No reselling, sharing or redistributing the files.

Who it's for: Contractors, trades and renovators.

See it used step by step: for contractors.

Try a free sample page

Free sample: Change Order Forms v1.0.3, page 3 of 6

Shows: The change order request: request details, reason for the change, description, attachments and estimated cost and time impact.

Not in the sample: The instructions page, the priced change order with contract sum and signatures, the change order log, the time-and-materials record and the editable DOCX files.

No account needed. The page is copied unchanged from the current file, with a “Sample” label and a faint watermark added. Free sample: print and use it for yourself, your household or your own business. Don't resell or redistribute the file; share the link instead. The full product is sold under the Standard Licence. See the full product.

Included files

  • Change-Order-Forms-Letter.docxChange Order Forms — editable Word document, US LetterDOCX
  • Change-Order-Forms-A4.docxChange Order Forms — editable Word document, A4DOCX
  • Change-Order-Forms-Letter.pdfChange Order Forms — printable PDF, US LetterPDF
  • Change-Order-Forms-A4.pdfChange Order Forms — printable PDF, A4PDF
  • Plus a single ZIP with every file and the licence (1.2 MB).

How to use

Open the Word file to type a change order and save one copy per change, or print the PDF forms (US Letter or A4) and fill them in by hand.

Customer reviews

No reviews yet. Reviews can only be written by customers who own this product.

Frequently asked questions

Is this a physical product?

No. This is a digital download. Nothing is shipped — you download the files from your account after purchase.

How do I get my files?

After payment, go to My Downloads in your account. Your purchase stays available there to re-download.

What can I do with it?

Use for yourself, your household or your own business. Print unlimited copies for that use. No reselling or sharing the files.

Do the estimating tools include local material prices?

No. Prices vary by region and supplier. You enter your own material, labour and markup rates; the spreadsheets do the maths.

Can you set the system up for my business?

Yes. Our Professional Setup Service (from $497) configures the estimating system with your rates, items and branding.